ESOC team during tests
Concentrating on communications with the ExoMars 2016 spacecraft, during the final system validation test, are Peter Schmitz (Spacecraft Operations Manager), Silvia Sangiorgi (Deputy Spacecraft Operations Manager) and (with back to camera) Todor Toshev (Spacecraft Controller).
Last Update: 1 September 2019