Asset Publisher

Assembly of drill extension rods

Assembly of drill extension rods

Date: 17 September 2012
Copyright: Selex Galileo - Nerviano, IT

This video shows the ExoMars rover drill during laboratory tests carried out in summer 2012.

The drill extension rod is assembled into the drill string, until it reaches the end position at a depth of 2 metres. (The video speed has been increased to allow all the functions to be shown in a short clip.)

This functional testing demonstrated the successful completion of the drilling sequence; it is one of a series of tests leading to the manufacture of the drill's qualification model in 2013.

Last Update: 1 September 2019
19-Apr-2024 22:03 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/8rq7b7W

Related Images

Related Videos

Related Publications

Related Links

Documentation